Same Day Pavement

Retail · Los Angeles, CA

Full-Depth Reconstruction — Retail Center

Mill-and-overlay plus ADA ramp upgrades across a 42,000 SF retail parking lot.

A regional retail portfolio owner identified accelerating alligator cracking and ponding across a 42,000 SF lot. Inspection confirmed a structurally sound base, making a mill-and-overlay the right call over full reconstruction — saving the ownership group a projected 35% versus remove-and-replace pricing while resolving the drainage issue at the northeast corner.

Paved Area

42,000 SF

Services

  • Overlay & Resurfacing
  • ADA Improvements
  • Striping
Start a Similar Project